Taroko National Park Headquarters (referred to as Taroko N. P. HQ) will be conducting painting work on the Changchun Bridge and Chunhui Bridge from April 8 to June 28, 2024. For construction needs and visitor safety, the Changchun Bridge and Chunhui Bridge on the old Provincial Highway 8 will be temporarily closed to all traffic during the construction period. However, to facilitate visitors to visit the Changchun Shrine (Eternal Spring Shrine), small vehicles will still be allowed to enter the Changchun Shrine parking lot. Visitors can enjoy the scenery from the observation platform, but due to limited space on-site, it will be difficult for large vehicles to turn around, so entry of large vehicles will be prohibited. We apologize for any inconvenience this may cause.
Taroko N. P. HQ requests that visitors cooperate with the trail closure measures. If the project is affected by weather conditions and the construction period is extended or changed, it will be announced.