Provincial Highway 8, 9 and 9D Road Construction Traffic Control Information for April 2023

  • Updated:2023-04-14
  • HitCount:128

Provincial Highway 8

Road partially Open /Road closed Guanyuan section between Mt. Hehuan Police Station (114.6 km) and Jinma Tunnel East Opening (120.6 km)

The Fourth Maintenance Office of the Directorate General of Highways, MOTC (Taroko Works Division) is responsible for the maintenance of road safety within Taroko National Park. There will be roadwork between 32.7 km – 41.5 km on Provincial Highway 14A (14Jia) and 110.2 km – 187.7 km on Provincial Highway 8 (Dayuling – Taroko) from April 6, 2023 – April 30, 2023.

Specifically:  

 

1. 117 km + 400 m Guanyuan Disaster Road Section on the Provincial Highway 8. The control section is from Jinma Tunnel's east entrance at 114.6 km highway marker (about 64 kilometers away from Taroko Arch Gate/about 1 hour and 45 minute driving time) to Guanyuan at 120.6 km (about 4 kilometers away from Dayuling). The passage period will be adjusted, respectively, daily from (1) 7:00 am - 8:00 am, (2) 10:00 am – 10:10 am, (3) 12:00 pm - 1:00 pm, and (4) 3:00 pm – 3:10 pm. (5) Starting from April 17, 2023 added one more passage time 5:00 pm – 5:10 pm.

 

The emergency repair team will arrange personnel to guard and control the 117.4 km disaster site on Provincial Highway 8 during each passage time. The construction site traffic control will open on time, depending on the slope conditions. Please wait patiently and arrive earlier at the control point before the passage time. Please cooperate, drive carefully and pass sequentially; the emergency repair team also reminds drivers that the disaster road section is still in the emergency repair stage. During the passage period, drivers should be aware that if the weather conditions are not good (heavy rainfall, dense fog cannot monitor the slope, etc.) the emergency repair team is permitted to close the road and prohibiting the passage of people and vehicles.

Road Closed Control Period: April 6, 2023 – April 30, 2023

Passage time: (1) 7:00 am - 8:00 am, (2) 10:00 am – 10:10 am, (3) 12:00 pm - 1:00 pm, and (4) 3:00 pm – 3:10 pm (5) Starting from April 17, 2023 added one more passage time 5:00 pm – 5:10 pm.

Open one direction of traffic once at a time for both direction traffic. Please follow the on-site personnel instruction.

Road closed time: 24hr including public holidays and weekends

Please plan your trip accordingly.

 

2. Provincial Highway 8 at 149 km (Ciyun Bridge section) for the Slope Improvement Construction Work

Traffic Control Time: 7:00 am – 6:00 pm

Control Period: April 10, 2023 – May 11, 2023

Passage time: Every 2 hour on the hour for 10 minutes (e.g. 07:00~07:10、09:00~09:10、11:00~12:00、14:00~14:10、16:00~16:10.)

Passage period: 6:00 pm – the next day morning 7:00 am (Night time no traffic controls, including public holidays and weekends)

Open one direction of traffic once at a time for both direction traffic.

3. Provincial Highway 8 at 182 km (Changchun Shrine section) for the Slope Stabilization Construction Work

Traffic Control Time: 8 am – 5 pm

Control Period: April 10, 2023 – May 10, 2023

Passage time: Every 1 hour on the hour for 10 minutes (e.g. 08:00-08:10, 09:00 – 09:10, 10:00 – 10:10 etc.)

Open one direction of traffic once at a time for both direction traffic. Please follow the on-site personnel instruction.

Traffic controls for #2-3 construction sites do not apply on weekends and public holidays.

 

The Directorate General of Highways urges drivers that, after a week after earthquake or heavy rain, roads in mountain areas are prone to rockfall and that it is advisable to avoid driving on these roads. Please remember to check the Provincial Highway real-time road condition bulletin, listen to police traffic road broadcasts, pay attention to road traffic related information, and plan your itinerary ahead of your trip. The Highway General Administration wishes you a safe journey.

 

Info Issued by The Fourth Maintenance Office of the Directorate General of Highways, MOTC (Taroko office TEL: +886-3-8610775 or +886-3-9962683)

Info Posted by Taroko National Park Headquarters

Updated date: April 14, 2023

 

 

Provincial Highway 9 & 9D Road Construction Traffic Control Information for April 2023

Road Open/Construction Traffic Control.

 

The Fourth Maintenance Office of the Directorate General of Highways, MOTC (Nan'ao Works Section) is responsible for the maintenance of road safety on Provincial Highway 9.

The Provincial Highway 9 will be the Slop Construction Work as the following:

 

  1. Provincial Highway 9D (9 Ding) at 51 km + 900 ~ 52 km + 388 (Ao’hua Tunnel) for the tunnel lighting equipment maintenance construction work

Control Period: March 27, 2023 - April 21, 2023

Control Time: 8:00 pm to the next morning 8:00 am

Passage Time: Open one direction of traffic once at a time for both direction traffic. (closed one lane for construction) Please follow the on-site personnel instruction.

Traffic controls for do not apply on weekends and public holidays.

  1. Provincial Highway 9D (9 Ding) at 51 km + 900 ~ 52 km + 388 (Ao’hua Tunnel), 67km + 046 ~ 67km + 260 (Renqing Tunnel), and 67km + 874 ~ 68km + 258 (Heqing Tunnel) for the tunnel lighting equipment maintenance work

Control Period: April 6, 2023 - April 15, 2023

Control Time: 8:00 am - 8:00 pm

Passage Time: Open one direction of traffic once at a time for both direction traffic. (partial closed for construction) Please follow the on-site personnel instruction.

  1. Provincial Highway 9D (9 Ding) at 148 km +200 and 61 km+300 (Heping – Hezhong Section) for the Slope Stabilization Construction Work

Control Period: April 6, 2023 - April 30, 2023

Control Time: 8:00 am to 5:00 pm (Traffic controls for do not apply on weekends and public holidays.)

Passage Time: Not predetermined - accessibility depends on checking work

Open one direction of traffic once at a time for both direction traffic. Please follow the on-site personnel instruction.

  1. Provincial Highway 9 at 119 km + 400 (Nan’ao Section) for the Slope Stabilization Construction Work

Control Period: April 10, 2023 - April 21, 2023

Control Time: 8:00 am to 5:00 pm (Traffic controls for do not apply on weekends and public holidays.)

Passage Time: Not predetermined - accessibility depends on checking work

Open one direction of traffic once at a time for both direction traffic. Please follow the on-site personnel instruction.

  1. Provincial Highway 9D at 4 km + 500, 8 km + 500, 11 km + 200, and13 km + 600 (Su’ao – Dong’ao Section) for the Slope Stabilization Construction Work

Control Period: April 17, 2023 - July 13, 2023

Control Time: 8:00 am to 5:00 pm (Traffic controls for do not apply on weekends and public holidays.)

Passage Time: Not predetermined - accessibility depends on checking work

Open one direction of traffic once at a time for both direction traffic. Please follow the on-site personnel instruction.

  1. Provincial Highway 9 at Dong’ao Tunnel for the tunnel equipment maintenance work

Control Period: April 18, 2023 - April 20, 2023 (Traffic controls for do not apply on weekends and public holidays.)

Control Time: 8:00 pm to the next morning 6:00 am

Closed southbound land: April 18, 2023

Closed northbound land: April 19, 2023

Closed one lane for maintenance work and open one direction of traffic once at a time for both direction traffic. Please follow the on-site personnel instruction.

  1. Provincial Highway 9 at 159 km + 300 (Daqingshui Tunnel) for the Tunnel Construction Work

Control Period: April 18, 2023 – May 15, 2023

Control Time: 8 am to 6 pm (Traffic controls for do not apply on weekends and public holidays.)

Passage Time: Not predetermined - accessibility depends on checking work

Open one direction of traffic once at a time for both direction traffic. Please follow the on-site personnel instruction.

 

Please plan your trip in advance.

 

The Directorate General of Highways reminds drivers to check the Provincial Highway real-time road condition bulletin, listen to police traffic road broadcasts, pay attention to road traffic related information, and plan your itinerary ahead of your trip. The Highway General Administration wishes you a safe journey.

 

Responsible Unit: Nan'ao Roadworks Section

Road condition inquiry: 03-9982521, 03-9962683

Inquiry contact: Section Director Chen He-ren (03-9982161-2)

 

Info Issued by The Fourth Maintenance Office of the Directorate General of Highways, MOTC