Skip to main content
  • Temperature:23 ℃
  • PoP:60%

Provincial Highway 8 traffic control information for May 2020.

  • Updated:2020-04-30
  • HitCount:310

Provincial Highway 8 traffic control information for May 2020. 
Road Open/Road Construction Traffic Control

 

The Fourth Maintenance Office of the Directorate General of Highways, MOTC (Taroko Works Division) is responsible for the maintenance of road safety within Taroko National Park. There will be roadwork between 112 km – 187 km on Provincial Highway 8 (Dayuling – Taroko) from May 1, 2020– May 31, 2020.

Specifically:

 

1. Provincial Highway 8 at 122 km + 600m (Jima Tunnel Section) for the Slope Stabilization Construction Work

Traffic Control Time: 8:00 am – 17:00 pm

Control Period : May 1, 2020– May 31, 2020

Passage time: Every 1 hour on the hour for 10 minutes (e.g. 08:00 – 08:10, 09:00 – 09:10, 10:00 – 10:10, etc.)

 

2. Provincial Highway 8 at 125 km + 400m (Jima Tunnel Section) for the Slope Stabilization Construction Work

Traffic Control Time: 8:00 am – 17:00 pm

Control Period : May 1, 2020– May 31, 2020

Passage Time: Not predetermined - accessibility depends on construction conditions.

 

3. Provincial Highway 8 at 148.3 km (Hualuxi Section) for the Slope Stabilization Construction Work

Traffic Control Time: 8:00 am – 17:00 pm

Control Period : May 1, 2020– May 31, 2020

Passage Time: Every 1 hour on the hour for 10 minutes (e.g. 08:00 – 08:10, 09:00 – 09:10, 10:00 – 10:10, etc.)

 

4. Provincial Highway 8 at 169 km + 650 m (Tianxiang Section) for the Slope Stabilization Construction Work

Traffic Control Time: 8:00 am – 17:00 pm

Control Period : May 1, 2020– May 31, 2020

Passage Time: Not predetermined - accessibility depends on construction conditions.

 

5. Provincial Highway 8 at 182.7 km (Ning’an Bridge) for the slope stabilization work

Traffic Control Time: 8:00 am – 5:00 pm

Control Period: May 1, 2020– May 31, 2020

Passage time: Every 1 hour on the hour for 10 minutes (e.g. 08:00 – 08:10, 09:00 – 09:10, 10:00 – 10:10, etc.)

 

Note: Traffic control for all the above construction sites do not apply on weekends and public holidays.

 

Visitors who are planning to visit Taroko Gorge (the 19km section between Taroko – Tianxiang) will be affected by #4-5 of the above list (for both directions). Visitors who are heading to Taichung or Puli, Nantou from Taroko National Park Headquarters via Provincial Highway 8 & 14A (14 Jia) will be affected by #1-5 of the above list (for both directions).

 

The Directorate General of Highways urges drivers that, after a week after earthquake or heavy rain, roads in mountain areas are prone to rockfall and that it is advisable to avoid driving on these roads. Please remember to check the Provincial Highway real-time road condition bulletin, listen to police traffic road broadcasts, pay attention to road traffic related information, and plan your itinerary ahead of your trip. The Highway General Administration wishes you a safe journey.

 

Responsible Unit: Taroko Roadworks Section

Road condition inquiry: 03-9962683

Inquiry contact: Section Director Chen Lihua (03-8610775)

 

News Issued by The Fourth Maintenance Office of the Directorate General of Highways, MOTC

News Posted by Taroko National Park