Skip to main content
  • Temperature:22 ℃
  • PoP:30%

Provincial Highway 8 & 9 construction traffic control info

  • Updated:2018-10-05
  • HitCount:1196
Provincial Highway 8 construction traffic control info

Provincial Highway 8 traffic control information due to road construction from Ludan Bridge to Xibao section 
Traffic controls are in effect for the safety of road users as a result of Highway Slope Stabilization Work.
Traffic Control Period: October 1st –October 31th, 2018


1. Provincial Highway 8 at 159.6km (Xibao repair construction work) 
Traffic Control Schedule: 07:30am - 17:30pm
Passage time: hourly on the half past for 10 minutes (eg: 8:30-8:40, 9:30-9:40,..)

2. Provincial Highway 8 at 169.7km (Tianxiang Section) Slope Stabilization Work 
Traffic Control Schedule: 18:00pm - 24:00pm (Evening Control)
Passage time: Not predetermined - accessibility depends on construction conditions.


3. Provincial Highway 8 at 172.7km (Cimu Bridge Section) 
Traffic Control Schedule: 08:00am - 17:00pm
Passage time: hourly on the hour for 10 minutes (eg: 8:00-8:10, 9:00-9:10, 10:00-10:10...)

4. Provincial Highway 8 at 177.3km (Ludan Bridge Section) 
Traffic Control Schedule: 08:00am - 17:00pm
Passage time: Not predetermined - accessibility depends on construction conditions.

The above construction sites will have NO traffic controls on weekends and public holidays.

Visitors who are planning to visit Taroko gorge (Taroko – Tianxiang 19 kilometer section) will be affected by the above traffic control #2 through #4.

Visitors who are heading to Taichung or Puli, Nantou via Provincial Highway 14A(Jia) will be affected by the above #1-4 traffic controls. (from both directions)

Please obey the construction zone traffic control personnels’ indications and pass quickly. Please pay attention for own safety. In the event of an earthquake or a week after heavy rains, please do not enter the mountain road. Plan ahead before your trip. Have a safe and pleasant journey!

Road Repair Unit: Directorate General of Highways, The fourth Maintenance Office 03-9962683 & Taroko Maintenance Office The Chief of Taroko Maintenance Office: Chang, Yu Bo, Contact TEL: 03-8610775 

News issued by Directorate General of Highways, MOTC, The fourth Maintenance Construction office & Taroko Maintenance Office

----
Provincial Highway 9 construction traffic control info

Provincial Highway 9- For the road user’s safety, the Highway Tunnel Repair Work is under construction at Heren section.


Provincial Highway 9 at 163.9km ~ 165.1km (Heren section) 
Traffic Control Dates: October 4th to October 31th, 2018
Traffic Control Schedule: 8:00am to 17:00pm 
Passage time: Not predetermined - accessibility depends on construction conditions. Open one direction traffic once at a time for both direction.
Traffic Control Schedule: 21:009m to 05:00am (Evening Control)
Passage time: two hourly on the hour for 10 minutes(eg: 23:00-23:10, 01:00am-01:10am, 03:00am-03:10am…)
*Note: The traffic controls do not apply on weekends and public holidays.

Please follow the on-site personnel’s direction to pass through the construction zone. 

Notice from Directorate General of Highways: Please pay attention for own safety. In the event of an earthquake or a week after heavy rains, please do not enter the mountain road. Plan ahead before your trip. Have a safe and pleasant journey!
Road Repair Unit: Directorate General of Highways, MOTC, The fourth Maintenance, contact TEL: (03)9962683
Nan’ao Maintenance Office contact telephone: 03-9982161~2

News Posted by Taroko National Park