:::

Traffic Control Measures for the Provincial Highway 8, 14A, and 9 for November 2026

Provincial Highway 8 – Central Cross-Island Highway

November Traffic Control Measures for the Eastern Section (Dayuling–Taroko Entrance)

Since the April 3, 2024 earthquake, the Taroko Maintenance Section of the Eastern Region Branch, Highway Bureau, has continued emergency repairs and reconstruction while taking into account the needs of local industries and road users. In the latter part of each month, it invites residents of the Greater Tianxiang area, industry associations, businesses, representatives of relevant agencies, and civil/geotechnical engineering consultants familiar with the Central Cross-Island Highway to discuss traffic control measures for the following month. Following the meeting held on October 29, the traffic control measures for November 2026 are as follows:

1. Guanyuan–Tianxiang (Provincial Highway 8, km 114.6–167.1)

(1) Traffic opening hours: Two-way traffic is permitted daily from 06:30 to 16:30. Control points: west end, in front of the Guanyuan Hehuan Police Station at km 114.6; east end, Tianxiang at km 167.1.

(2) Road clearance period: 16:30–18:30 daily. No vehicles may enter the controlled section; vehicles already inside may exit only.

(3) Nighttime closure: The road is closed daily from 18:30 to 06:30 the following day.

(4) Construction control sections: Mobile traffic control will be implemented at km 112.6 (Dayuling section), km 116.5 (Guanyuan section), km 140 (Xinbaiyang section), km 153.8 (Luoshao section), and km 157.7 (Horan Pavilion section).

2. Tianxiang–Taroko Entrance (Provincial Highway 8, km 167.7–184.5)

(1) Traffic opening hours: Traffic will be released in both directions in five scheduled periods daily between 06:30 and 18:00: 06:30–08:00, 10:00–10:05, 12:00–13:00, 15:00–15:05, and 17:00–18:00. Control points: west end, at the Lushui Shuiwen Bridgehead at km 169.5; east end, east portal of Shakadang Tunnel.

(2) Road clearance period: 18:00–18:30 daily. No vehicles may enter the controlled section; vehicles already inside may exit only.

(3) Nighttime closure: The road is closed daily from 18:30 to 06:30 the following day. Control points: west end, Tianxiang at km 167.7; east end, the east portal of Shakadang Tunnel and Taroko Entrance at km 184.5.

(4) Construction control sections: At the four work zones at km 172.2 (west portal of Jiuqudong Tunnel), km 173.5 (east portal of Jiuqudong Tunnel), km 174.9 (east portal of Zhuilu Tunnel), and km 175.5 (west portal of Jinheng Tunnel), traffic will be released in five scheduled periods coordinated with the releases between Tianxiang and Taroko Entrance. During each release period, the work zones on both sides will coordinate with one another. As a general rule, all vehicles that have arrived and are waiting at both ends of the work zones before the release will be allowed to pass before construction traffic control resumes.

(5) Traffic diversion: Traffic between Taroko Entrance and Changchun Tunnel will continue to be diverted as follows:

Westbound (Taroko to Tianxiang): Shakadang Tunnel (Taroko N. P. HQ) → Xila'an Tunnel → Changchun Tunnel (Provincial Highway 8) → Tianxiang.

Eastbound (Tianxiang to Taroko): Provincial Highway 8 → Changchun Tunnel → Taroko Entrance.

3. Other Temporary or Mobile Work Zones

For other temporary or mobile works, such as asphalt pavement milling and resurfacing, nearby work zones and the scheduled traffic release times at Guanyuan, Tianxiang, and Taroko Entrance will be taken into consideration. To minimize disruption, short-duration mobile traffic control may be implemented, or separate control measures will be announced.

Travel Advisory

The Taroko Maintenance Section reminds motorists traveling from Dayuling to Taroko Entrance (approximately 74 km) to plan their journeys carefully. Eastbound (Dayuling to Taroko): Arrive at Tianxiang no later than 17:00 to catch the final release period, 17:00–18:00. Westbound (Taroko to Dayuling): Pass the traffic control station at the east portal of Shakadang Tunnel no later than 15:00 to ensure that you can pass the Guanyuan control point before the 18:00 nighttime closure.

The eastern section of the Central Cross-Island Highway (Provincial Highway 8) continues to undergo disaster-recovery works on slopes, roadbeds, and pavement damaged by the earthquake and typhoons. Traffic releases may be delayed or cancelled due to weather or unforeseen circumstances. Please plan ahead, prepare contingency arrangements, and monitor weather forecasts and road control/access information. For the latest updates, use the Highway Bureau Smart Provincial Highway Real-Time Information Service (https://168.thb.gov.tw), download the Happy Highway App, or listen to traffic broadcasts.

The Highway Bureau wishes you a safe journey.

Responsible Unit: Taroko Maintenance Section

Road Information Hotline: 03-9962683

Contact: Section Chief Chang Pei-Yun (03-8610775)

Last Updated: November 2, 2026

For the latest information on Provincial Highway 8 (Central Cross-Island Highway), contact the Taroko Maintenance Section at 03-8610775 or the Eastern Region Branch, Highway Bureau, at 03-9962683. Information is current as of November 2, 2026. Please contact the managing authority to confirm any changes.

------------------------------------------------------
------------------------------------------------------

Provincial Highway 14A – Wushe Branch Road

Two-Way Traffic Control on Provincial Highway 14A, km 2.5–3.5 (Ren’ai Junior High School Section)

Road milling and resurfacing works will be carried out across all lanes on the km 2.5–3.5 section of Provincial Highway 14A near Ren’ai Junior High School from October 12 to November 2, 2026, daily from 19:00 to 06:00 the following day. During construction, alternating, single-lane two-way traffic control will be implemented. No work will be carried out on weekends or public holidays. Please check road conditions and drive carefully.

Full-Lane Road Milling and Resurfacing on Provincial Highway 14A, km 0–0.061 (Wushe Section)

Road milling and resurfacing works will be carried out across all lanes on the km 0–0.061 section of Provincial Highway 14A in Wushe from November 4 to November 6, 2026, daily from 09:00 to 16:00. Single-lane mobile traffic control will be implemented as conditions require. Please check road conditions and drive carefully.

The Highway Bureau advises motorists to check roadside variable message signs when traveling through these sections. The traffic control center will issue traffic updates and provide driving advice as needed. For traffic arrangements and real-time road conditions, visit http://www.thb.gov.tw or http://168.thb.gov.tw, download the Happy Highway App, or call the toll-free Motorist Service Hotline at 0800-231-035.

The Highway Bureau wishes you a safe journey.

Responsible Office: Puli Maintenance Section, Central Region Branch, Highway Bureau

Road Condition Hotline: 049-2982066

Contact: Section Chief Qiu Bing-rong

Last Updated: November 2, 2026

For the Central Cross-Island Highway Wushe Branch Road (Provincial Highway 14A), contact the Taroko Maintenance Section at 03-8610775 or the Puli Maintenance Section at 049-2982066. Information is current as of November 2, 2026. Please contact the managing authority to confirm any changes.

------------------------------------------------------
------------------------------------------------------

Provincial Highway 9 – Su-hua Highway

Construction and Traffic Control Information (Updated November 2, 2026)

Provincial Highway 9, Su-hua Highway Improvement Project, Su'ao–Dong’ao Section: The northbound lanes will be fully closed from 21:00 on November 24 to 06:00 the following day. Please detour via Provincial Highway 9D.

Provincial Highway 9D, km 9.4 (Jiugongli Section) – Drainage Culvert and Road Surface Improvements: September 10–November 30, 2026, daily from 08:00 to 17:00. Alternating, single-lane two-way traffic control.

Provincial Highway 9, km 113.5–123.4 (Dong’ao–Nan’ao Section) – Transport of steel girders for the reconstruction of the Matai’an Creek Bridge: November 2–21, 2026, daily from 23:20 to 01:30 the following day. The northbound lane will be closed at 23:20 (control points: km 123.4 and km 121.8). Both directions will be fully closed from 23:30 to 00:20. Control and reopening times may be adjusted depending on the vehicle’s arrival time in the section. This measure also applies on holidays.

Provincial Highway 9, km 116.1 (Dong’ao Section) – Slope trimming and protective net installation: October 20–November 13, 2026, daily from 09:00 to 16:00. Alternating, single-lane two-way traffic control.

Provincial Highway 9, km 120.9–121.3 (Nan’ao Section) – Road milling and resurfacing: November 3–4, 2026, daily from 09:00 to 17:00. Mobile traffic control will be implemented as needed.

Provincial Highway 9, km 146.37–148.17 (Heping Section) – Road milling and resurfacing: November 4, 2026, from 09:00 to 17:00. Alternating, single-lane two-way traffic control. Work will be postponed in case of rain.

Provincial Highway 9, Suhua Highway Improvement Project, Hezhong–Heren Section: (a) The southbound lanes will be fully closed on November 3, 4, 18, and 19, 2026, from 21:00 to 06:00 the following day. Please detour via Provincial Highway 9D. (b) The northbound lanes will be closed to one-way traffic from 21:00 on November 9 to 01:00 the following day. Please follow on-site traffic personnel’s instructions and detour via Provincial Highway 9D.

Provincial Highway 9, km 155.09–165.7 (from the north portal of Renshui Tunnel to Chongde) – Military operations: Temporary mobile traffic control will be implemented at 19:00 on October 30 and November 3, 2026.

Mountain Road Safety Advisory

Mountain roads are vulnerable to rockfalls due to earthquake damage. Road conditions can be difficult to predict during heavy or prolonged rainfall. Avoid traveling on mountain roads in the affected areas unless necessary. Monitor weather forecasts and road access information, plan your journey in advance, and prepare contingency arrangements. For the latest information, use the Highway Bureau Smart Provincial Highway Real-Time Information Service, download the Happy Highway App, or listen to traffic broadcasts.

The Highway Bureau wishes you a safe journey.

Last Updated: November 2, 2026

For the Su-hua Highway (Provincial Highway 9), contact the Nan’ao Maintenance Section at 03-9982161, the Jinyue Maintenance Section at 03-9982501, or the Eastern Region Branch, Highway Bureau, at 03-9962683. Information is current as of November 2, 2026. Please contact the managing authority to confirm any changes.