跳到主要內容區塊 定位點
定位點

Roads and Trails

Road Conditions-2018/10/20

  • Open
    Open (Construction traffic control),

    Provincial Highway 8 construction traffic control info

    Provincial Highway 8 traffic control information due to road construction from Ludan Bridge to Xibao section
    Traffic controls are in effect for the safety of road users as a result of Highway Slope Stabilization Work.
    Traffic Control Period: October 1st –October 31th, 2018


    1. Provincial Highway 8 at 159.6km (Xibao repair construction work)
    Traffic Control Schedule: 07:30am - 17:30pm
    Passage time: hourly on the half past for 10 minutes (eg: 8:30-8:40, 9:30-9:40,..)

    2. Provincial Highway 8 at 169.7km (Tianxiang Section) Slope Stabilization Work
    Traffic Control Schedule: 18:00pm - 24:00pm (Evening Control)
    Passage time: Not predetermined - accessibility depends on construction conditions.

    3. Provincial Highway 8 at 172.7km (Cimu Bridge Section)
    Traffic Control Schedule: 08:00am - 17:00pm
    Passage time: hourly on the hour for 10 minutes (eg: 8:00-8:10, 9:00-9:10, 10:00-10:10...)

    4. Provincial Highway 8 at 177.3km (Ludan Bridge Section)
    Traffic Control Schedule: 08:00am - 17:00pm
    Passage time: Not predetermined - accessibility depends on construction conditions.

    The above construction sites will have NO traffic controls on weekends and public holidays.

    Visitors who are planning to visit Taroko gorge (Taroko – Tianxiang 19 kilometer section) will be affected by the above traffic control #2 through #4.

    Visitors who are heading to Taichung or Puli, Nantou via Provincial Highway 14A(Jia) will be affected by the above #1-4 traffic controls. (from both directions)

    Please obey the construction zone traffic control personnels’ indications and pass quickly. Please pay attention for own safety. In the event of an earthquake or a week after heavy rains, please do not enter the mountain road. Plan ahead before your trip. Have a safe and pleasant journey!

    Road Repair Unit: Directorate General of Highways, The fourth Maintenance Office 03-9962683 & Taroko Maintenance Office The Chief of Taroko Maintenance Office: Chang, Yu Bo, Contact TEL: 03-8610775

    News issued by Directorate General of Highways, MOTC, The fourth Maintenance Construction office & Taroko Maintenance Office

    News Posted by Taroko National Park
  • Open
    Open/Su-hua Highway

    Provincial Highway 9 construction traffic control info

    Provincial Highway 9- For the road user’s safety, the Highway Tunnel Repair Work is under construction at Heren section.

    Provincial Highway 9 at 163.9km ~ 165.1km (Heren section)
    Traffic Control Dates: October 4th to October 31th, 2018
    Traffic Control Schedule: 8:00am to 17:00pm
    Passage time: Not predetermined - accessibility depends on construction conditions. Open one direction traffic once at a time for both direction.
    Traffic Control Schedule: 21:009m to 05:00am (Evening Control)
    Passage time: two hourly on the hour for 10 minutes(eg: 23:00-23:10, 01:00am-01:10am, 03:00am-03:10am…)
    *Note: The traffic controls do not apply on weekends and public holidays.

    Please follow the on-site personnel’s direction to pass through the construction zone.

    Notice from Directorate General of Highways: Please pay attention for own safety. In the event of an earthquake or a week after heavy rains, please do not enter the mountain road. Plan ahead before your trip. Have a safe and pleasant journey!
    Road Repair Unit: Directorate General of Highways, MOTC, The fourth Maintenance, contact TEL: (03)9962683
    Nan’ao Maintenance Office contact telephone: 03-9982161~2
  • Open
    Open

    Provincial Highway 14Jia(14A)

    Road info inquiries: Taroko Maintenance Office 03-8610775, Puli Maintenance Office 049-2982066 (Wushe Maintenance Office) 049-2802030

    News issued by Directorate General of Highways, MOTC, The fourth Maintenance Construction office & Taroko Maintenance Office
TOP