跳到主要內容區塊 定位點
定位點

Roads and Trails

Road Conditions-2018/07/19

  • Open
    Open (Construction traffic control),

    Provincial Highway 8 construction traffic control info

    Provincial Highway 8 traffic control information due to road construction from Cimu Bridge to Kuanyuan section for July 1st – July 31, 2018.
    Traffic controls are in effect for the safety of road users as a result of Highway Slope Stabilization Work.

    1. Provincial Highway 8 at 115.05km (Kuanyuan section) (This traffic control will not be controlled at the same time as 119.11km.)
    Traffic Control Schedule: 08:00am - 17:00pm
    Passage time: hourly on the hour for 10 minutes (eg: 8:00-8:10, 9:00-9:10,...)

    2. Provincial Highway 8 at 119.11km (Kuanyuan section) (This traffic control will not be controlled at the same time as 115.05km.)
    Traffic Control Schedule: 08:00am - 17:00pm
    Passage time: hourly on the hour for 10 minutes (eg: 8:00-8:10, 9:00-9:10,...)

    3. Provincial Highway 8 at 131.25km (Ci’en Section)
    Traffic Control Schedule: 08:00am - 17:00pm
    Passage time: Not predetermined - accessibility depends on construction conditions.

    4. Provincial Highway 8 at 168.2km (Tianxiang Section) Slope Stabilization Work
    Traffic Control Schedule: 08:00am - 17:00pm
    Passage time: hourly on the hour for 10 minutes (eg: 8:00-8:10, 9:00-9:10,...)

    5. Provincial Highway 8 at 169.7km (Tianxiang Section) Slope Stabilization Work *Evening Traffic Controls
    Traffic Control Schedule: 18:00pm - 24:00am
    Passage time: Not predetermined - accessibility depends on construction conditions.

    6. Provincial Highway 8 at 172.7km (Cimu Bridge Section)
    Traffic Control Schedule: 08:00am - 17:00pm
    Passage time: hourly on the hour for 10 minutes (eg: 8:00-8:10, 9:00-9:10, 10:00-10:10...)

    The above construction sites will have NO traffic controls on weekends and public holidays.

    Visitors who are planning to visit Taroko gorge (Taroko – Tianxiang 19 kilometer section) will be affected by the above traffic control #5. Those visiting Baiyang trail will be affected by the above traffic controls #4 thru #6.

    Visitors who are heading to Taichung or Puli, Nantou via Provincial Highway 14A(Jia) will be affected by the above #1-6 traffic controls. (from both directions)

    Please obey the construction zone traffic control personnels’ indications and pass quickly. Please pay attention for own safety. In the event of an earthquake or a week after heavy rains, please do not enter the mountain road. Plan ahead before your trip. Have a safe and pleasant journey!

    Road Repair Unit: Directorate General of Highways, The fourth Maintenance Office 03-9962683 & Taroko Maintenance Office The Chief of Taroko Maintenance Office: Chang, Yu Bo, Contact TEL: 03-8610775

    News issued by Directorate General of Highways, MOTC, The fourth Maintenance Construction office & Taroko Maintenance Office

    News Posted by Taroko National Park
  • Open
    Open
    Suhua Highway

    Notice from Directorate General of Highways: Please pay attention for own safety. In the event of an earthquake or a week after heavy rains, please do not enter the mountain road. Plan ahead before your trip. Have a safe and pleasant journey!

    Road Repair Unit: Directorate General of Highways, MOTC, The fourth Maintenance, contact TEL: 03-9982161-2
    Nan’ao Maintenance Office contact telephone: 03-9962683

    News Posted by Taroko N. P. Headquarters
  • Open
    Open

    Provincial Highway 14Jia(14A)

    Road info inquiries: Taroko Maintenance Office 03-8610775, Puli Maintenance Office 049-2982066 (Wushe Maintenance Office) 049-2802030

    News issued by Directorate General of Highways, MOTC, The fourth Maintenance Construction office & Taroko Maintenance Office
TOP