Skip to main content
  • Temperature:21 ℃
  • PoP:10%

Provincial Highway 8 & 14A (Jia) traffic control information for March 22 – March 31, 2021

  • Updated:2021-03-22
  • HitCount:322

Provincial Highway 8 & 14A (Jia) traffic control information for March 22 – March 31, 2021

Road Open/Road Construction Traffic Control.

The Fourth Maintenance Office of the Directorate General of Highways, MOTC (Taroko Works Division) is responsible for the maintenance of road safety within Taroko National Park. There will be roadwork between 32.7 km – 41.5 km on Provincial Highway 14A (14Jia) and 110.2 km – 184.5 km on Provincial Highway 8 (Dayuling – Taroko) from March 1, 2021– March 31, 2021.

Specifically:

 

1. Provincial Highway 14A (14Jia) at 34 km + 180 m (Kenanguang Section) for the Slope Stabilization Construction Work

Traffic Control Time: 8:00 am – 17:00 pm

Control Period: March 1, 2021– March 31, 2021

Passage Time: Every 1 hour on the hour for 10 minutes (e.g. 08:00 – 08:10, 09:00 – 09:10, 10:00 – 10:10 etc.)

 

2. Provincial Highway 8 at 117 km+380 m (Guanyuan Section) for the Slope Stabilization Construction Work

Traffic Control Time: 8:00 am – 17:00 pm

Control Period: March 1, 2021– March 31, 2021

Passage Time: Every 1 hour on the hour for 10 minutes (e.g. 08:00 – 08:10, 09:00 – 09:10, 10:00 – 10:10 etc.)

 

3. Provincial Highway 8 at 160 km + 700 m (Xibao Section) for the Drainage improvement Construction Work

Traffic Control Time: 8:00 am – 17:00 pm

Control Period: March 3, 2021– March 31, 2021

Passage Time: Not predetermined - accessibility depends on construction conditions.

Open one direction of traffic once at a time for both direction traffic.

 

4. Provincial Highway 8 at 168 km + 260 m (old Hwy. marker 169 km + 650m) (Tianxiang Section) for the New Rockfall Prevention Tunnel Construction Work

Traffic Control Time: 24 hours

Control Period: March 1, 2021– March 31, 2021

Passage Time: Accessibility follows the traffic lights. Open one direction of traffic once at a time for both direction traffic. (Sun – Mon, 24 hr including public holidays).

 

5. Provincial Highway 8 at 174 km + 900m (East Zhuilu Tunnel) for the Slope Stabilization Construction Work

Traffic Control Time: 8:00 am – 17:00 pm

Control Period: March 22, 2021– March 28, 2021

Passage Time: Accessibility follows the traffic lights. Open one direction of traffic once at a time for both direction traffic. (Sun – Mon, 24 hr including public holidays).

 

6. Provincial Highway 8 at 179 km + 100 (Xipan Dam Section) for the Upper Slope Stabilization Construction Work

Traffic Control Time: 8:00 am – 17:00 pm

Control Period: March 22, 2021– April 30, 2021

Passage Time: Every 1 hour on the hour for 10 minutes (e.g. 08:00 – 08:10, 09:00 – 09:10, 10:00 – 10:10 etc.)

 

Note: Traffic control for all the above construction sites do not apply on weekends and public holidays except for the above #4-5.

 

Visitors who are planning to visit Taroko Gorge (the 19km section between Taroko – Tianxiang) will be affected by #4-6 of the above list (for both directions). Visitors who are heading to Taichung or Puli, Nantou from Taroko National Park Headquarters via Provincial Highway 8 & 14A (14Jia) will be affected by #1-6 of the above list (for both directions).

The Directorate General of Highways urges drivers that, after a week after earthquake or heavy rain, roads in mountain areas are prone to rockfall and that it is advisable to avoid driving on these roads. Please remember to check the Provincial Highway real-time road condition bulletin, listen to police traffic road broadcasts, pay attention to road traffic related information, and plan your itinerary ahead of your trip. The Highway General Administration wishes you a safe journey.

 

Responsible Unit: Taroko Roadworks Section

Road condition inquiry: 03-9962683

Inquiry contact: Section Director Chen Li-hua (03-8610775)

 

News Issued by The Fourth Maintenance Office of the Directorate General of Highways, MOTC

News Posted by Taroko National Park