Go to the main content section Anchor
Anchor

Roads and Trails

Mountaineering Trail-2020/09/19

  • Closed
    Trail Closed due to the construction works. The three phases of construction and the dates of closure at Zhuilu Old Road are as follows: 1. September 15th, 2020 (Tuesday) – September 30th, 2020 (Wednesday), 16 days total. 2. October 16th, 2020 (Friday) – October 30th, 2020 (Friday), 15 days total. 3. November 16th, 2020 (Monday) – November 30th (Monday), 15 days total.
  • Open
    Trail Open: Hikers should be reminded that the probability of landslides is amplified following continuous/heavy rain. Please pay particular attention to your own safety.
  • Open
    open: Hikers should be reminded that the probability of landslides is amplified following continuous/heavy rain. Please pay particular attention to your own safety.
  • Open
    open: Hikers should be reminded that the probability of landslides is amplified following continuous/heavy rain. Please pay particular attention to your own safety.
  • Open
    open: Hikers should be reminded that the probability of landslides is amplified following continuous/heavy rain. Please pay particular attention to your own safety.
  • Open
    Open. Hikers should be reminded that the probability of landslides is amplified following continuous/heavy rain. Please pay particular attention to your own safety.
  • Open
    open: Hikers should be reminded that the probability of landslides is amplified following continuous/heavy rain. Please pay particular attention to your own safety.
  • Open
    open: (A) This trail requires a Park Entry Permit. (B) Hikers should be reminded that the probability of landslides is amplified following continuous/heavy rain. Please pay particular attention to your own safety.
  • Open
    open: (A) This trail requires a Park Entry Permit. (B)The slope above the trail at the 0.3 km marker on the 820 Forestry Road has collapsed; the ground conditions at this section are unstable. (C) Hikers should be reminded that the probability of landslides is amplified following continuous/heavy rain. Please pay particular attention to your own safety.
  • Open
    open: (A) This trail requires a Park Entry Permit. (B) The slope above the trail at the 0.3 km marker on the 820 Forestry Road has collapsed; the ground conditions at this section are unstable. (C) Hikers should be reminded that the probability of landslides is amplified following continuous/heavy rain. Please pay particular attention to your own safety.
  • Open
    open: Hikers should be reminded that the probability of landslides is amplified following continuous/heavy rain. Please pay particular attention to your own safety.
  • Open
    open: (A) This trail requires a Park Entry Permit. (B) Hikers should be reminded that the probability of landslides is amplified following continuous/heavy rain. Please pay particular attention to your own safety.
  • Open
    open: ((A) This trail requires a Park Entry Permit and a Mountain (Police) Entry Permit.(B) Hikers should be reminded that the probability of landslides is amplified following continuous/heavy rain. Please pay particular attention to your own safety. (C) Please pay special attention to your surrounding conditions (e.g. rockfall, felled wood, loose or collapsed ground, flood-prone areas) and err on the side of caution.
  • Open
    open: (A) This trail requires a Park Entry Permit. (B) Hikers should be reminded that the probability of landslides is amplified following continuous/heavy rain. Please pay particular attention to your own safety. (C) Please pay special attention to your surrounding conditions (e.g. rockfall, felled wood, loose or collapsed ground, flood-prone areas) and err on the side of caution.
  • Open
    open: (A) This trail requires a Park Entry Permit. (B) Hikers should be reminded that the probability of landslides is amplified following continuous/heavy rain. Please pay particular attention to your own safety. (C) Please pay special attention to your surrounding conditions (e.g. rockfall, felled wood, loose or collapsed ground, flood-prone areas) and err on the side of caution.
  • Open
    open: (A) This trail requires a Park Entry Permit and a Mountain (Police) Entry Permit. (B) Steeply-sloping areas are prone to rockfall and landslides immediately after a natural disaster (e.g. earthquake, typhoon). Please pay special attention to your surrounding conditions (e.g. rockfall, felled wood, loose or collapsed ground, flood-prone areas) and err on the side of caution.
  • Partially Open
    Partially Open. There are hornet beehives nearby 1.2 - 1.4 km from the Wenshan trailhead. There is a high potential risk to visitors so the trail is closed from the Wenshan trailhead - 3.05 km point. The triail is open from Luishui trailhead to 2.45 km point. Please return via the same route doubleback.
Top